Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi

Capacity

6,38 kW

Location

Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi

Solar modules

SOLET 410MH5-54 28 pcs

Inverter

Solax X3-10K-TL 1 pcs 10 kW

Annual electricity production

9570 MWh

Shirak province, Gyumri 25․78 kW
Shirak province, Gyumri
15 September 2019
25․78 kW
Voskanyan Group 115.5 kW
Voskanyan Group
"Voskanyan Group" LLC, producer of cans, will use the inexhaustible energy of the sun from now on, saving 𝟖,𝟖𝟑𝟓,𝟎𝟎𝟎 AMD
115.5 kW
"Ararat" restaurant, Syunik province, c. Kapan 99.96 kW
"Ararat" restaurant, Syunik province, c. Kapan
99.96 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW