SECONDARY SCHOOL OF SARATAK

Capacity

30,34 kW

Location

SECONDARY SCHOOL OF SARATAK

Solar modules

SOLET 410MH5-54 74 pcs

Inverter

Solax X3-PRO-30K-G2 1 pcs 30 kW

Annual electricity production

45510 kWh

VI-EL-VI company, salon Shiraz 220,5 kWt
VI-EL-VI company, salon Shiraz
An innovative project equipped with the German SMA ShadeFix shade management system will produce more electricity than standard plants.
220,5 kWt
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Kaputan secondary school 23,37 kW
Kaputan secondary school
23,37 kW
Production of sanitary products, Shirak province, Gyumri 20.52 kW
Production of sanitary products, Shirak province, Gyumri
20.52 kW