"GAVA" LLC, Aragatsotn province, Ashtarak

Capacity

28.5 kW

Location

Aragatsotn province, Ashtarak

Solar modules

,AE SOLAR 380 W, monocrystalline 75 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

42380 kWh

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Kotayk province, v. Qasakh 10.35 kW
Kotayk province, v. Qasakh
09 Sep 2018
10.35 kW
Syunik province, Agarak 10.2 kW
Syunik province, Agarak
05 Nov 2019
10.2 kW
Hatis Secondary school after V. Vardanyan SNCO 20,5kW
Hatis Secondary school after V. Vardanyan SNCO
20,5kW