"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW
Buzhakan Secondary school after Gegham Gharibyan 51,25 kW
Buzhakan Secondary school after Gegham Gharibyan
51,25 kW
Yerevan, Arabkir administrative district 6.84 kW
Yerevan, Arabkir administrative district
6.84 kW
Kaputan secondary school 23,37 kW
Kaputan secondary school
23,37 kW