"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

"Biokat" LLC, Yerevan city, Haghtanak district 178.2 kW
"Biokat" LLC, Yerevan city, Haghtanak district
Արևային համագործակցություն հանուն էկոլոգիապես մաքուր ապագայի
178.2 kW
Shirak province, Gyumri 25․78 kW
Shirak province, Gyumri
15 September 2019
25․78 kW
Armavir province, Armavir 9.9 kW
Armavir province, Armavir
05 June 2019
9.9 kW
"Bonilat" LLC, Yerevan, Myasnikyan Ave. 99.36 kW
"Bonilat" LLC, Yerevan, Myasnikyan Ave.
12 July 2019
99.36 kW