"PrintMan" Printing house, Shirak province, Gyumri

Capacity:

11.4 kW

Location:

Marz Shirak, Gyumri

Solar modules:

AE SOLAR 380 W, monocrystalline 30 pcs, Germany

Inverter:

SMA Sunny Tripower 10000 TL, Germany

Annual electricity production։

17100 kWh

Type:

On-grid, three-phase

Kaputan secondary school 23,37 kW
Kaputan secondary school
23,37 kW
Lori province, Vanadzor 5.52 kW
Lori province, Vanadzor
18 July 2018
5.52 kW
Gyumri, V․ Sargsyan street 6․84 kW
Gyumri, V․ Sargsyan street
6․84 kW
"Viar" smithy, Kotayk province, Yeghvard 15.2 kW
"Viar" smithy, Kotayk province, Yeghvard
15.2 kW