Pharmacy, Kotayk province, Zovuni village

Capacity

15.96 kW

Location

Kotayk province, Zovuni village

Solar modules

,AE SOLAR 380 W, monocrystalline 42 pcs., Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

23940 kWh

MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW
Gyumri Basic School No. 6 25,83 kW
Gyumri Basic School No. 6
25,83 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district 42.78 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district
15 January 2019
42.78 kW
Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW