VI-EL-VI company, salon Shiraz

 

Kotayk province, v. Zovuni 3.45 kW
Kotayk province, v. Zovuni
11 March 2019
3.45 kW
MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW
Hatis Secondary school after V. Vardanyan SNCO 20,5kW
Hatis Secondary school after V. Vardanyan SNCO
20,5kW
Yerevan, Noy district 9.9 kW
Yerevan, Noy district
15 March 2019
9.9 kW