VI-EL-VI company, salon Shiraz

 

Yerevan, Ajapnyak 6.12 kW
Yerevan, Ajapnyak
15 October 2019
6.12 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
"MG" Supermarket, Yerevan, Bagratunyats St. 100.32 kW
"MG" Supermarket, Yerevan, Bagratunyats St.
100.32 kW
Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi 6,38 kW
Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi
6,38 kW