"Artsakh" hotel, Yerevan, Shengavit administrative district

Capacity:

42.78 kW

Location:

Yerevan, Shengavit a.d.

Solar modules:

AE SOLAR 345 W, monocrystalline 124 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 20000 TL, Germany

Annual electricity production։

64170 kWh

Type:

On-grid, three-phase

Kotayk province, v. Qasakh 10.35 kW
Kotayk province, v. Qasakh
09 Sep 2018
10.35 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str. 30.36 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str.
15 August 2017
30.36 kW
Yerevan, Noy district 9.9 kW
Yerevan, Noy district
15 March 2019
9.9 kW
Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi 6,38 kW
Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi
6,38 kW