Yerevan, Nor Nork

Capacity:

10.2 kW

Location:

Yerevan, Nor Nork

Solar modules:

AE SOLAR 340 W, monocrystalline 30 pcs, Germany

Inverter:

SMA SUNNY BOY 5.0, 2 pcs, Germany

Annual electricity production։

15300 kWh

Type:

On-grid, single-phase

School, Syunik province, Agarak 22.44 kW
School, Syunik province, Agarak
27 July 2019
22.44 kW
"Sam" LLC, Syunik province, Sisian 9․52 kW
"Sam" LLC, Syunik province, Sisian
9․52 kW
Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW