Yerevan, Nork-Marash administrative district

Capacity

31.92 kW

Location

Yerevan, Nork-Marash administrative district

Solar modules

,AE SOLAR 380 W, monocrystalline 84 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

47880 kWh

"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Yerevan, Nubarashen 3.06 kW
Yerevan, Nubarashen
23 August 2019
3.06 kW
LUSAGHBYUR SECONDARY SCHOOL 20,09 kW
LUSAGHBYUR SECONDARY SCHOOL
20,09 kW
Gyumri Basic School No. 6 25,83 kW
Gyumri Basic School No. 6
25,83 kW