Yerevan, Noy district

Capacity:

9.9 kW

Location:

Yerevan, Noy district

Solar modules:

AE SOLAR 330 W, monocrystalline 30 pcs, Germany

Inverter:

SMA Sunny Tripower 10000 TL, Germany

Annual electricity production։

15000 kWh

Type:

On-grid, three-phase

"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW
Buzhakan Secondary school after Gegham Gharibyan 51,25 kW
Buzhakan Secondary school after Gegham Gharibyan
51,25 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
"MNB" LLC, Armavir province, Musaler village 226.59 kW
"MNB" LLC, Armavir province, Musaler village
226.59 kW