Hatis Secondary school after V. Vardanyan SNCO

Capacity

20,5 kW

Location

Hatis Secondary school after V. Vardanyan SNCO

Solar modules

SOLET 410MH5-54 50 pcs

Inverter

Solax X3-PRO-20K-G2 1 pcs 20 kW

Annual electricity production

30750 kWh

CHILDREN'S ART SCHOOL OF THE MARTUNI 16,4 kW
CHILDREN'S ART SCHOOL OF THE MARTUNI
16,4 kW
Aragatsotn province, v. Parpi 5.28 kW
Aragatsotn province, v. Parpi
25 June 2019
5.28 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village 800 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village
The installation of 800 kW power plant was made with 14 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
01 July 2020
800 kW
Shirak province, Gyumri 25․78 kW
Shirak province, Gyumri
15 September 2019
25․78 kW