Hatis Secondary school after V. Vardanyan SNCO

Capacity

20,5 kW

Location

Hatis Secondary school after V. Vardanyan SNCO

Solar modules

SOLET 410MH5-54 50 pcs

Inverter

Solax X3-PRO-20K-G2 1 pcs 20 kW

Annual electricity production

30750 kWh

"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Kotayk province, v. Zovuni 3.45 kW
Kotayk province, v. Zovuni
11 March 2019
3.45 kW
Ararat province, Sayat Nova village 9.36 կՎտ
Ararat province, Sayat Nova village
9.36 կՎտ
"TEZH LER" RESORT, Lori Province, Shahumyan village 115 kW
"TEZH LER" RESORT, Lori Province, Shahumyan village
115 kW