Hatis Secondary school after V. Vardanyan SNCO

Capacity

20,5 kW

Location

Hatis Secondary school after V. Vardanyan SNCO

Solar modules

SOLET 410MH5-54 50 pcs

Inverter

Solax X3-PRO-20K-G2 1 pcs 20 kW

Annual electricity production

30750 kWh

Martuni Culture House 15,17 kW
Martuni Culture House
15,17 kW
"Bonilat" LLC, Yerevan, Myasnikyan Ave. 99.36 kW
"Bonilat" LLC, Yerevan, Myasnikyan Ave.
12 July 2019
99.36 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW