"Via Sakra" Clinic, Shirak province, Gyumri

Capacity:

5.94 kW

Location:

Marz Shirak, Gyumri

Solar modules:

AE SOLAR 330 W, monocrystalline 18 pcs, Germany

Inverter:

SMA Sunny Boy 6.0, Germany

Annual electricity production։

8910 kWh

Type:

On-grid, single-phase

Armavir province, Metsamor 5.32 kW
Armavir province, Metsamor
5.32 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
LUSAGHBYUR SECONDARY SCHOOL 20,09 kW
LUSAGHBYUR SECONDARY SCHOOL
20,09 kW
Aragatsotn province, v. Ushi 5.28 kW
Aragatsotn province, v. Ushi
20 July 2019
5.28 kW