"MG" Supermarket, Yerevan, Bagratunyats St.

Capacity:

100.32 kW

Location:

Yerevan, Bagratunyats St.

Solar modules:

AE SOLAR 380 W, monocrystalline 264 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER CORE1 STP 50-40, 2 pcs, Germany

Annual electricity production։

155496 kWh

Type:

On-grid, three-phase

"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48 28.5kW
"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48
28.5kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str. 30.36 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str.
15 August 2017
30.36 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Buzhakan Secondary school after Gegham Gharibyan 51,25 kW
Buzhakan Secondary school after Gegham Gharibyan
51,25 kW