Gyumri, V․ Sargsyan street

Capacity

6․84 kW

Location

Gyumri, V․ Sargsyan street

Solar modules

AE SOLAR 380 W, monocrystalline 18 pcs, Germany

Inverter

SMA Sunny Tripower 6.0, Germany

Annual electricity production

10260 kWh

Hatis Secondary school after V. Vardanyan SNCO 20,5kW
Hatis Secondary school after V. Vardanyan SNCO
20,5kW
LUSAGHBYUR SECONDARY SCHOOL 20,09 kW
LUSAGHBYUR SECONDARY SCHOOL
20,09 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village 800 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village
The installation of 800 kW power plant was made with 14 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
01 July 2020
800 kW