Yerevan, Nork-Marash administrative district

Capacity

23.56 kW

Location

Yerevan, Nork-Marash administrative district

Solar modules

,AE SOLAR 380 W, monocrystalline 62 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

35340 kWh

"G.Solar" LLC, Aragacotn Province, Karmrashen village 800 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village
The installation of 800 kW power plant was made with 14 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
01 July 2020
800 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district 42.78 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district
15 January 2019
42.78 kW
"MNB" LLC, Armavir province, Musaler village 226.59 kW
"MNB" LLC, Armavir province, Musaler village
226.59 kW
Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi 6,38 kW
Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi
6,38 kW