"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48

Capacity

28.5 kW

Location

Yerevan, Nerqin Charbakh 48

Solar modules

AE SOLAR 380 W, monocrystalline 75 pcs, Germany

Inverter

SMA Sunny Tripower 25000 TL, Germany

Annual electricity production

42750 kWh

Shirak province, Gyumri 25․78 kW
Shirak province, Gyumri
15 September 2019
25․78 kW
Yerevan, Arabkir administrative district 6.84 kW
Yerevan, Arabkir administrative district
6.84 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str. 30.36 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str.
15 August 2017
30.36 kW
MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW