Aragatsotn province, v. Parpi

Capacity:

5.28 kW

Location:

Marz Aragatsotn, v. Parpi

Solar modules:

AE SOLAR 330 W, monocrystalline 16 pcs, Germany

Inverter:

SMA SUNNY BOY 5.0, Germany

Annual electricity production։

7920 kWh

Type:

On-grid, single-phase

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Kaputan secondary school 23,37 kW
Kaputan secondary school
23,37 kW
Zar secondary school named after J.Sargsyan 75,85 kW
Zar secondary school named after J.Sargsyan
75,85 kW
Sevaberd secondary School 10.66 kW
Sevaberd secondary School
10.66 kW