"Viar" smithy, Kotayk province, Yeghvard

Capacity:

15.2 kW

Location:

Marz Kotayk, Yeghvard

Solar modules:

AE SOLAR 380 W, monocrystalline 40 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 15000 TL, Germany

Annual electricity production։

22800 kWh

Type:

On-grid, three-phase

Armavir province, v. Parakar 5.28 kW
Armavir province, v. Parakar
05 Jule 2019
5.28 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW
Voskanyan Group 115.5 kW
Voskanyan Group
"Voskanyan Group" LLC, producer of cans, will use the inexhaustible energy of the sun from now on, saving 𝟖,𝟖𝟑𝟓,𝟎𝟎𝟎 AMD
115.5 kW