"TEZH LER" RESORT, Lori Province, Shahumyan village

Capacity

115 kW

Location

Lori Province, Shahumyan village

Solar modules

AE SOLAR 450 W, monocrystalline 256 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, 100 kW, Germany

Annual electricity production

144000 kWh

 

Kotayk province, v. Ara 5.28 kW
Kotayk province, v. Ara
5.28 kW
Vacation house belonging to the Central Bank of the Republic of Armenia 57,75 kW
Vacation house belonging to the Central Bank of the Republic of Armenia
57,75 kW
Yerevan, Ajapnyak 6.12 kW
Yerevan, Ajapnyak
15 October 2019
6.12 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW